• Abo-Bakr, M.; Anders, W.; Burrill, A.; Barday, R.; Bürkmann-Gehrlein, K.; Dürr, V.; Jankowiak, A.; Kalus, C.; Kamps, T.; Khan, V.; Klemz, G.; Knobloch, J.; Kolbe, J.; Kugeler, O.; Kuske, B.; Matveenko, A.; Meseck, A.; Neumann, A.; Ott, K.; Panofski, E.; Pflückhahn, D.; Rahn, J.; Rudolph, J.; Schmeißer, M.; Schubert, S.; Schüler, O.; Völker, J.; Wesch, S.: Status of the HZB ERL Prototype bERLinPro. In: Proceedings of IPAC 2014, Dresden, Germany, 2014. - ISBN 978-3-95450-132-8, p. 340-342


Abstract:
The Berlin Energy Recovery Linac Prototype BERLinPro is to be constructed at the Helmholtz Zentrum site in Berlin. The aim of the project is to expand the required accelerator physics and technology knowledge mandatory for the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beam. Since the funding decision in October 2010 the project has entered a phase of detailed planning. Hardware specifications have been defined and various components have been ordered. Furthermore, extensive tests of principal superconducting accelerator components successfully demonstrated the envisaged hardware performance. A summary of the most recent activities together with the details of the project timeline for the coming years are given in this paper.